AI Playground

Prompt Inspiration

Explore

dwarf barbarian portrait hold an Axe --s 750

an elephant angrily running through a forest with a rider on top, watercolour --c 10

space colony war, city battlefield, detailed and realistic, ruins and dirt, fog and mist, troops and tanks, wild west settlement, sci-fi concept art

Create a couple in simple makeshift Halloween costumes of a pirate and a bee, stumbling down a street completely wasted with closes eyes after a night of partying and drinking. They look very tired out. Surround them with a people in various Halloween outfits, vibrant decorations, and festive lights, capturing the chaotic and joyful atmosphere of Halloween night. --style raw

asians partying on a freeway in a traffic jam, summertime, day, dancing --v 5.0

mass of humanoid hands with a squid-like head from which manypipe-like bone appendices come out, white background

close-up, male filipino pinoy lightning mage walking past a gothic hindu temple, holding a crackling magic wand, inspired by kj apa tom daley adam rippon, colored inks style, style of luis royo, leonid afremov, mike zeck, edgard maxence, mondrian --niji 5

D&D battlemap, top down view, 2d, gray twisting streets, Medieval London, gray city streets, treeless, street layout is irregular

small 3d render of a crt monitor of old computer in center, little saturn figure in monitor, dreamy and cozy, calm, deep black space background, painted by rococo painting style --ar 16:9

book page, ink style, Black and white, pen drawing --v 5.2 --s 1000

Become a member

Sign up to download HD images, copy & bookmark prompts.
It's absolutely FREE

google Login or Signup with Google

Limit Reached

Upgrade for premium prompts, full browsing, unlimited bookmarks, and more.

Get Premium